2465 North 50th Street Bala Building, Suite 10E Philadelphia, PA 19131 (P) (215) 877-8210 (F) (215) 877-8150
Currently, ADCON has had more than 120 schools under construction. ADCON is providing The School District of Philadelphia with cost estimation and analysis, schedule analysis, construction planning and scheduling, assessment and feasibility studies, change order review services, and project closeouts. A partial list of schools ADCON has performed these services for can be found below.
- Anna B. Day Elementary School
- Benjamin Rush Middle School
- Edward Heston Elementary School
- Feltonville School of Arts & Science
- Harrington Elementary School
- Henry E. Houston Elementary School
- James Logan Elementary School
- John F. Hartranft Community Center
- John F. Hartranft Community School
- John F. Hartranft Elementary School
- John H. Brown Elementary School
Cheyney University - Leslie Pinckney Hill Library Assessment
Adcon performed a facility assessment of the Leslie Pinckney Hill Library at Cheyney University. This assessment consisted of evaluating and describing the existing conditions of the mechanical, plumbing, fire protection, and electrical systems (MEFP systems) along with other building components. The MEFP systems of the Leslie Pinckney Hill Library were mostly defunct and in a poor deteriorated condition. Based on Adcon's assessment, Adcon recommended equipment upgrades that would bring the facilities up to code and regulation. A drawing set of the existing physical conditions was created. Additionally, a prioritized list of repairs for each building component was created, along with a cost estimate for each component.
Click to enlarge
- Joseph C. Ferguson Elementary School
- Robert Blair Pollock Elementary School
- Samuel B. Huey Elementary School
- South Philadelphia High School
- Thomas Holme Elementary School
- West Philadelphia High School
- William D. Kelley Elementary School
- William Dick Elementary School
Construction/Project Management Engineering